MaxIron clients across asset-intensive sectors

Clients

Operators MaxIron works with

Across UK airports, ferries, oil & gas, gas distribution, building materials, industrial services, utilities and the public sector. Some clients are public reference customers and have published case studies; others are kept private out of respect for live engagements. References are available on request during proposal.

Transport & airports

Top 5 UK airport

United Kingdom

IBM Maximo for terminal and airside operations: asset hierarchy, work management, mobile rollout to engineering teams, integration with operational systems.

Read the airport operator case study →

Maritime

UK ferry operator (national service)

United Kingdom

IBM MAS 9.0 on Red Hat OpenShift across the fleet: maintenance regimes, dry-dock planning, integration with marine operational systems and finance.

Read the ferry operator case study →

Oil & gas

Global oil & gas major (UKCS operations)

United Kingdom Continental Shelf

Standards-led IBM Maximo aligned to ISO 14224 and API RP 14C: failure-coding hierarchy, criticality model, reliability data discipline at global scale.

Read the oil & gas major case study →

Utilities — gas distribution

UK gas distribution network

United Kingdom

Embedded Maximo data lead and developer inside the platform team: stronger data governance, faster delivery of platform improvements, regulator-grade reporting.

Read the gas distribution case study →

Manufacturing — heavy materials

UK & Ireland building materials group

United Kingdom & Ireland

EAM transformation across multiple business units onto IBM Maximo: SAP-to-Maximo migration in eight months, accelerated cloud transition, DB2 conversion, unified operating model.

Read the building materials group case study →

Industrial services & engineering

UK industrial joint venture

United Kingdom

Takeover of a live IBM Maximo environment from an underperforming incumbent in two months: zero service disruption, structured governance, roadmap-led BAU support model.

Read the industrial JV case study →

Utilities

FTSE 250 UK utility

United Kingdom

Long-running IBM Maximo support and continuous improvement: AMP-aligned regulatory reporting, performance optimisation, mobile workforce uplift.

Case study not currently public — reference available on request.

Public sector

UK public sector body

United Kingdom

IBM Maximo and MAS services procurable through G-Cloud 14: implementation, MAS upgrade, managed hosting and application support.

Case study not currently public — reference available on request.

Procurement & references

Need a named reference?

We introduce named clients who can take a reference call during proposal — matched to the sector, the size of estate and the specific service in scope. UK public-sector buyers can also procure MaxIron directly through the UK G-Cloud 14 framework.